Post

1 follower Follow
0
Avatar

Using the Activity Log or File time stamps in calculations

Can you use either the Activity Log or the action of loading files onto items in calculations? (without using Globiflow)
I am trying to calculate the date of a file being loaded based on the date of another input field.
eg
Due date = xx/xx/xxxx (existent input field)
File loaded on yy/yy/yyyy (using either the activity load time stamp or file time stamp)
Calculate days between xx/xx/xxxx and yy/yy/yyyy

 

Thanks

Nicole Atkinson

Please sign in to leave a comment.